About

Twenty-one years at the press

A Penang works that grew from two moulding machines to every process in the chain — still run by engineers.

The modern works and material silos of a plastics manufacturing plant

Our story

Two decades of moulding, run by engineers

Meridian Polymer Works began in 2004 with two moulding machines in a rented unit in Bayan Lepas, taking overflow work from the Penang electronics cluster. What set it apart was simple: engineers on the floor who could read a drawing and fix a mould, not just run a press.

Twenty-one years on, the works spans three moulding halls, an in-house tool room and an ISO Class 8 cleanroom, supplying E&E, medical, automotive and packaging OEMs across Malaysia and fourteen export markets. The principle has not changed — one accountable supplier, from mould to inspected part.

From the Managing Director

We would rather turn a job down than take one we cannot hold to spec. That discipline is why customers who came for one part stayed for their whole programme.
Ir. Tan Chee Keong · Founder & Managing Director

The works, in numbers

Capacity you can plan a programme around

42

Injection machines, 50–650 T

260M

Parts moulded per year

A robotic arm serving an automated moulding cell

Automation cell — three-shift, lights-out capable

14

Export markets shipped

21 yrs

Moulding in Penang

They took our tool over mid-programme and had validated parts running in six weeks. Zero line stoppages since.

Supply chain lead, tier-1 automotive OEM

260M

parts moulded every year for 40+ OEMs

Trusted on the lines that cannot stop — across E&E, medical and automotive.

ISO 9001ISO 13485IATF 16949ISO 14001RoHS / REACH

Request a quote

Send us a drawing. We'll send back a plan.

Material, tolerance, finish and lead time — usually within two working days. Talk to our engineers, not a call centre.